by B ogunmefun | Nov 15, 2022
WHITE HOUSE SCHOOL A two-and-a-half storey hybrid CLT and steel frame structure designed for the White House Preparatory School in collaboration with vPPR Architects. The Brief Situated between Grade II listed buildings, the new design required sensitive...
by B ogunmefun | Nov 16, 2021
ST. PHILIPS CHURCH This new 21m x 21m worship hall is the centrepiece to the new St. Philips Church, just outside Birmingham. The structure consists of glulam timber portal frames with a 13m tall ridge. Tisserin Engineers were appointed as specialist timber engineers...
by B ogunmefun | Nov 15, 2021
PAVILION TEA HOUSE A new CLT and glulam structure has been designed to replace the hugely popular 1930s tea house in Hove Park, Brighton. Tisserin were appointed to provide a Structural and Civil engineering service for the new proposal, including the detailed...