THFC Media Centre
·
Structures, Fabrication Modelling, Advanced Timber Engineering, Drainage
Reinforced Concrete, Steel, Glulam and CLT
Wolves Lane Centre
Structures, Drainage
Timber, Masonry, Straw Bales
GSK Reception Building
Structures, Drainage, Advanced Timber Engineering
Glulam, CLT
Three Tree Pavilion
Structures, Advanced Timber Engineering
Timber
808-812 Tottenham High Road
St Philip's Church
Structures, Fabrication Modelling, Advanced Timber Engineering
CLT House
Structures, Temporary Works, Advanced Timber Design, Staircase Design
Three Rivers Passivhaus
Structures, Advanced Timber Design
Maxilla Gardens
Melbury Gardens
The Observer Building
Structures
Barbara Hucklesbury Close
Structures, Survey, Design
Brookhurst Farm
The Boathouse
Groundschool
Woodentops Nursery
Game Changers
Structures, Design
St Mary of Zion Church
Aberdeen Covid Memorial
Unity Place
Structures, Timber
— Chris Wong, Architect
— Joe Hall, Project Manager, G-Frame Ltd
— Roger Zogolovitch, Director and Founder, Solidspace